| Thread | Last Post | Replies |
|
| salope | 17 Dec 2006 10:00 GMT | 4 |
|
| Space junk problem rising to new heights [EAS jettison, mid-2007] | 15 Dec 2006 08:47 GMT | 86 |
Space junk problem rising to new heights [EAS jettison, mid-2007] Disposal of piano-sized space station piece poses challenges http://www.msnbc.msn.com/id/15817106/ By James Oberg, NBC News space analyst // Special to MSNBC
|
| solar flare alert! | 14 Dec 2006 09:51 GMT | 8 |
The crew was directed into 'storm shelter' areas on board the station overnight to seek highest radiation protection, due to a massive new solar flare.
|
| Heard on Local Fox News | 14 Dec 2006 06:16 GMT | 8 |
"Successful liftoff of Space Shuttle. They will be fixing the wiring on the Hubble Telescope." -- really, I did hear this.
 Signature Barbara Needham
|
| uh-oh | 13 Dec 2006 17:45 GMT | 7 |
NASA SpaceFlight.com NASA evaluating Discovery issues By Chris Bergin, 12/11/2006 2:20:00 PM http://www.nasaspaceflight.com/content/?cid=4948 Shuttle Discovery is on schedule for tonight's arrival at the
|
| Shuttle tile damage images | 13 Dec 2006 05:47 GMT | 1 |
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts116/news/msb_121206.html
|
| What kind of computers are in use at Mission Control Center? | 13 Dec 2006 02:45 GMT | 7 |
Here in Sweden we have seen a lot of clips from Mission Control Center, Mission Launch Center and from Flight Control. I wonder what kind of computers are in use and what operating system they are using? I have seen tracking with familiar Linux and windows IDE. Mission critical
|
| Norwegian newspaper: parts of shuttle wing have fallen off | 12 Dec 2006 23:02 GMT | 2 |
Chris Bergin (www.nasaspaceflight.com) is warning: "Ok, I'm being warned a major Norway newspaper is claiming parts of Discovery's wing have come off "http://www.dagbladet.no/nyheter/2006/12/12/485841.html - headline
|
| "nominal shutdown" | 12 Dec 2006 18:07 GMT | 3 |
What was this call? About a min. before MECO, they told the PLT to expect a nominal shutdown.. never heard that call before - What would something non-nominal be? Were they referring to abort modes or something else?
|
| Mid Deck Sink | 12 Dec 2006 12:54 GMT | 1 |
I remember when the program started much was made of the sink with running water aboard the shuttle (the bulb like unit into which the crew could insert their hands and wash while having the water contained) I have heard much as to how it has functioned for the
|
| STS-116 Mission Day 2/3 | 12 Dec 2006 07:23 GMT | 1 |
POST MMT / MISSION STATUS BRIEFING DAY 2 http://www.space-multimedia.nl.eu.org/index.php?option=com_content&task=view&id=1287 STS-116 FLIGHT DAY 2 HIGHLIGHTS http://www.space-multimedia.nl.eu.org/index.php?option=com_content&task=view&id=1276
|
| Spacehab vs MPLM | 12 Dec 2006 02:03 GMT | 11 |
What's the difference in structure, function and use between the Spacehab and the MPLM?
|
| Shuttle spotting | 11 Dec 2006 18:31 GMT | 5 |
Anyone know if/when the shuttle / ISS will be visible from Leeds in the UK? Thanks
|
| true shape of 'ring of fire'.. | 11 Dec 2006 14:28 GMT | 3 |
I think the pre-MECO ring of fire is the result of our perspective from observing from on board the shuttle -- and the actual 3-D shape of the glowing region is a hollow cone with the shuttle at its apex. The cone, widening with distance from the shuttle, is the region of exhaust ...
|
| Shuttle/ISS docking question | 11 Dec 2006 11:02 GMT | 10 |
Something I have always wondered... Why is it, that after a shuttle docks with the space station, it takes nearly two hours for them to get around to opening the hatches? Katipo
|